Project Profiles

Shotts to Kemerton - WA
2006/07 - Shotts to Kemerton 275kV Transmission Line (WA) Double Circuit - Assembly, Erection & Stringing Works. 150 Lattice towers


Page 1 of 1: << Previous Page | Next Page >>
View Slideshow
Image #1 of 15: a-SHT-KEM 330 kV. Replacing 30m of damaged Conductor Image #2 of 15: b-SHT-KEM 330 kV. Replacing 30m of damaged Conductor Image #3 of 15: c-SHT-KEM 330 kV. Spacer InstallationImage #4 of 15: d-SHT-KEM 330 kV. Tower Assembly
Image #5 of 15: e-SHT-KEM 330 kV. Tower AssemblyImage #6 of 15: f-SHT-KEM 330 kV. Tower AssemblyImage #7 of 15: g-SHT-KEM 330 kV. Tower Assembly,Erection Image #8 of 15: h-SHT-KEM 330 kV. Tower Assembly,Erection
Image #9 of 15: i-SHT-KEM 330 kV. Tower Assembly,ErectionImage #10 of 15: j-SHT-KEM 330 kV. Tower Assembly,ErectionImage #11 of 15: k-SHT-KEM 330 kV. Tower Assembly,ErectionImage #12 of 15: l-SHT-KEM 330 kV. Tower Assembly,Erection
Image #13 of 15: m-SHT-KEM 330 kV. Tower ErectionImage #14 of 15: n-SHT-KEM 330 kV. Tower Erection Image #15 of 15: o-SHT-KEM 330 kV. Tower Erection
Image Preview Zoom

PRO RIG Photo Gallery

Hold the mouse pointer over the thumbnail images for a preview.

Click on the thumbnail for a larger view.

Click on View Slideshow for a pop-up gallery slideshow

ph: +61 7 4659 0377 or +61 (0) 419 704 806 Fax: +61 7 3251 0833
PO Box 9364, Wilsonton. Queensland Australia 4350
ABN 68 112 477 086
 www.prorig.net.au